If the proposed bond issue passes The Reservation will receive field turf, new 2 level press box, new concessions and restrooms, extra track lane, extended stands to replace the row removed due to the extra lane, plus skirting around the stands to match the school i.e. a brick facade so the metal under the stands will not be visable.

Posted

If the proposed bond issue passes The Reservation will receive field turf, new 2 level press box, new concessions and restrooms, extra track lane, extended stands to replace the row removed due to the extra lane, plus skirting around the stands to match the school i.e. a brick facade so the metal under the stands will not be visable.

I think once the first school gets it then other will finally as well.